首页 社会内容详情
足彩投注比例:KPower gets four-year PPA extension

足彩投注比例:KPower gets four-year PPA extension

分类:社会

网址:

SEO查询: 爱站网 站长工具

点击直达

皇冠网址www.hg108.vip)是皇冠体育官网线上直营平台。皇冠网址面向亚太地区招募代理,开放皇冠信用网代理申请、皇冠现金网代理会员开户等业务。皇冠网址可下载皇冠官方APP,皇冠APP包括皇冠体育最新代理登录线路、皇冠体育最新会员登录线路。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

足彩投注比例www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。足彩投注比例上足球分析专家数据更新最快。足彩投注比例开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

发布评论