首页 体育内容详情
新2网址(www.hg108.vip):Fukushima debris removal delayed by another year

新2网址(www.hg108.vip):Fukushima debris removal delayed by another year

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

欧博官网手机版www.aLLbet8.vip)是欧博集团的官方网站。欧博官网手机版开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

新2网址www.hg108.vip)实时更新发布最新最快的新2代理线路、新2会员线路、新2备用登录网址、新2手机版登录网址、新2皇冠登录网址。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

发布评论